Always on, like the sun over Larsa.

A planned Tier III data center in Baghdad, engineered for Iraq's climate and the demands of modern cloud and AI workloads.

99.982%Tier III availability target
52°CCooling design rating
180racksPhase 1 · 1 MW
72hrsFuel autonomy
N+1Dual A/B power
  • Tier III target
  • ISO roadmap
  • AI-ready
  • Carrier-neutral
2 MWFull build capacity
~360Racks at full build
8,000 m²Purpose-built campus
20 monthsTarget to operation

The campus

One secure site, every system in view.

A purpose-built 8,000 m² campus: main data halls with rooftop solar, training academy, substation, generation and cooling plant — all inside a layered secure perimeter.

Structural wireframe blueprint of the Larsa data center campus showing the main data halls with rooftop solar, training academy, visitor parking, substation, generators, chillers and secure perimeter fence
Conceptual wireframe visualisation of the Larsa campus — final design subject to engineering.

Digital infrastructure, on Iraqi soil

Built for a nation that cannot afford downtime.

Carrier-neutral infrastructure for government, banking, telecom, cloud, content and national-scale AI.

01

Sovereign cloud

Private and hybrid cloud environments hosted in Baghdad, keeping critical workloads and data under Iraqi jurisdiction.

02

AI / HPC infrastructure

High-density pods, liquid-cooling connections and 400G+ fibre paths ready for GPU training and inference workloads.

03

Colocation & recovery

Secure racks, private cages, managed services and a certified disaster-recovery destination for critical operations.

Engineered for Baghdad

International resilience, tuned to local reality.

Every essential system can be maintained without planned shutdown, from the power room to the meet-me room.

1 MW2 MW

Phase 1 capacity, expanding within the same purpose-built facility.

01

Dual power paths

Independent A and B paths to every rack, with N+1 generation and 72 hours of on-site fuel.

02

Designed for 52°C

Air-cooled chillers with free cooling and almost no water use, engineered for Baghdad's climate.

03

Five-layer security

A guarded perimeter, mantrap, biometric halls, customer cages and locked racks.

04

Carrier-neutral fibre

Two meet-me rooms and geographically diverse routes, open equally to licensed operators.

AI-ready by design

We host the compute.
We do not compete to own it.

Larsa gives enterprises, cloud platforms and research institutions a neutral home for high-density infrastructure in Iraq.

  • Liquid-cooling connections integrated into the chilled-water system
  • Expansion pad reserved for additional cooling and transformer capacity
  • Floor loading and 400G+ fibre paths prepared for GPU racks
  • Standard racks up to 20 kW in the high-density pod

Iraqi Data Center Training Academy

Training the engineers who will run Iraq's backbone.

A dedicated academy combining classroom instruction with hands-on rack, fibre, cooling, safety and AI infrastructure training.

150–200Iraqi trainees per year
once operational · target
Data center training laboratory with server racks and workstations Skills built in Baghdad

AI course advisor

Get your personal learning path

Tell us where you want to go and what you have done so far. Our AI-powered advisor will suggest courses in the right order.

Your recommended path will appear here.

Course catalog

Planned curriculum

Schedules are indicative targets for when the academy opens.

FoundationsBeginner

Data Center Fundamentals

How a Tier III facility works end to end: power path, cooling, racks, cabling, monitoring and operations.

  • 2 weeks · Classroom + lab
  • Monthly cohorts · Sun–Thu, 9:00–14:00
FacilitiesIntermediate

Critical Power Operations

UPS, switchgear, generators and A/B power distribution, with live maintenance drills and fault scenarios.

  • 3 weeks · Hands-on lab
  • Bi-monthly · Sun–Thu, 9:00–15:00
FacilitiesIntermediate

Cooling for Extreme Climates

Designing and running cooling built for 52°C ambient: containment, chillers, CRAH units and liquid cooling.

  • 2 weeks · Classroom + lab
  • Quarterly · Sun–Thu, 9:00–14:00
NetworkBeginner

Fibre & Structured Cabling

Fibre splicing, termination, testing and cable management to international standards.

  • 1 week · Hands-on lab
  • Monthly · Sun–Thu, 9:00–15:00
NetworkAdvanced

Data Center Network Engineering

Leaf-spine fabrics, BGP, carrier interconnects and cross-connect operations in a carrier-neutral facility.

  • 4 weeks · Lab + project
  • Quarterly · Evenings, Sun–Wed 17:00–20:00
Cloud & AIIntermediate

Sovereign Cloud Operations

Running virtualisation, Kubernetes and storage platforms for government and enterprise tenants.

  • 3 weeks · Virtual + lab
  • Bi-monthly · Evenings, Sun–Wed 17:00–20:00
Cloud & AIAdvanced

AI & GPU Infrastructure

High-density GPU racks, liquid cooling, high-speed fabrics and scheduling for AI training and inference.

  • 3 weeks · Lab + project
  • Quarterly · Sun–Thu, 9:00–14:00
SecurityIntermediate

Physical & Cyber Security Operations

Five-layer physical security, access control, SOC monitoring and ISO 27001-aligned procedures.

  • 2 weeks · Classroom + lab
  • Quarterly · Sun–Thu, 9:00–14:00

Course inquiry

Ask about a course

Register your interest and our academy team will contact you about upcoming cohorts.

Research & Development

Where Iraq's research meets the market.

The Larsa campus is planned to host a dedicated R&D center — an open door for researchers, professors and students to run applied studies that answer real market needs.

Researchers

Academic and industry researchers run energy, cooling and reliability experiments on production-grade infrastructure — from test rigs to full-hall pilots.

Professors

Faculty partners co-design applied research with the Larsa team, supervise projects and use live facility data in teaching and publications.

Students

Graduate and senior students take on thesis projects, internships and hands-on labs inside a working data hall, mentored by operating engineers.

Research directions, set with the market

Cooling & energy above 50°C

High-ambient cooling, free-cooling strategies and power efficiency tuned to Iraq's climate.

Sovereign AI workloads

GPU cluster operations, Arabic-language model serving and localised AI inference at scale.

Network & interconnection

Fibre resilience, carrier peering and edge architectures for government and industry.

Market-driven applied research

Directions prioritised with partners in banking, telecom, energy and the public sector.

Propose a study, a thesis partnership or a joint research programme with Larsa.

Collaborate with the R&D center

R&D programmes are planned targets that open alongside the facility's commissioning.

Development roadmap

From design to a certified, live facility.

A disciplined 20-month target programme, followed by fit-out of the second 1 MW hall as demand grows.

1

Month 0

Launch

Licences, site and design team
2

Month 4

Design certified

Tier III design target and equipment orders
3

Month 11

Building complete

Structure and envelope sealed
4

Month 14

Power on

Electrical and cooling energised
5

Month 20

Certified & live

Facility certification target and first customers
Planned certification programme
Uptime Tier III · ISO 27001 · ISO 22301 · ISO 9001 · ISO 50001 · PCI DSS support · SOC 2 Type II

Future partners

Building Iraq's digital future, together.

We are opening the Larsa campus to a first circle of partners across education, government and global technology — organizations we aim to collaborate with as the facility comes online.

Dave SchoolTechnology educationMinistry of CommunicationsGovernment of Iraq
MetaGlobal technology
GoogleCloud & AI
AmazonCloud infrastructure

Future partners are shown as intended collaboration directions as the facility develops; no endorsement or current agreement is implied.

Build Iraq's digital future with us

Anchor your next critical workload in Baghdad.

Talk to the Larsa team about colocation, disaster recovery, sovereign cloud, AI infrastructure or strategic partnership.

Have a project in mind? Press “Start a conversation” and a short form will appear here.